Results:
Keyword: defense OR gvo OR swc

Aug. 23, 2013

Army Needs Better Processes to Justify and Manage Cost-Reimbursement Contracts

We are required to perform this audit in accordance with the FY 2009 National Defense Authorization Act, section 864, “Regulations on the Use of Cost Reimbursement Contracts.”

Aug. 22, 2013

Assessment of the DSE 40mm Grenades

Our assessment focused on the reliability and quality control procedures for 40mm grenades procured by DoD from DSE, Inc. Specifically, we assessed the quality management systems employed by DSE Systems, LLC., a division of DSE, Inc., for manufacturing the M550 fuze.

Aug. 15, 2013

Enhanced Oversight Needed for Nontactical Vehicle Fleets in the National Capital Region

We determined whether the Navy, Defense Logistics Agency (DLA), Pentagon Force Protection Agency (PFPA), and Washington Headquarters Services (WHS) had controls in place to accurately assess their requirements for nontactical vehicles...

Aug. 13, 2013

National Geospatial-Intelligence Agency Did Not Comply With Base Realignment and Closure Legislation

We conducted this audit in response to a request from then Senator Jim Webb. We determined whether the National Geospatial-Intelligence Agency (NGA) complied with Public Law 101-510, “Defense Base Closure and Realignment Act of 1990,” as amended.

July 30, 2013

Defense Information Systems Agency Needs to Improve Its Information Assurance Vulnerability Management Program (For Official Use Only)

The report is For Official Use Only. To file a Freedom of Information Act request, please submit a request to FOIA Online.

July 19, 2013

Defense Advanced Research Projects Agency Properly Awarded Contracts for Disc-Rotor Research and Development

We conducted this audit in response to a congressional request for the DoD Inspector General to investigate a constituent’s complaint concerning an improper contract award for disc-rotor technology.

July 18, 2013

Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System toAccount for Military Equipment Assets

Our overall objective was to determine whether amounts reported in the Defense Departmental Reporting System were supported by business processes in the Navy Enterprise Resource Planning (ERP) system for the Aircraft, Shipbuilding, and Weapons Procurement appropriations.

July 16, 2013

DoD Oversight Improvements Are Needed on the Contractor Accounting System for the Army’s Cost- Reimbursable Stryker Logistics Support Contract

We evaluated the effectiveness of the contractor logistics support (CLS) strategy for the Stryker family of vehicles. This report is the third in a series of three reports and addresses contractor billings.

July 2, 2013

Contract Administration of the Subsistence Prime Vendor Contract for Afghanistan Improved, butAdditional Actions are Needed

We determined whether Defense Logistics Agency Troop Support implemented the recommendations in Audit Report No. D-2011-047 and determined whether corrective actions addressed the problems.

June 28, 2013

Assessment of U.S. Military Cemeteries DODIG-2019-098

The fieldwork for this assessment was conducted from April to September 2012. The team evaluated adequacy of and adherence to the statutes, policies, and regulations governing the management, oversight, operations, and interments or inurnments (or both) by those cemeteries, less those of the U.S. military academies, under the jurisdiction of the military departments.

  • Office of Inspector General, United States Department of Defense, 4800 Mark Center Drive, Alexandria, VA 22350-1500