Defense Logistics Agency Award and Administration of Energy Savings Performance Contracts DODIG-2018-135

We determined whether the Defense Logistics Agency (DLA) officials: • maintained competition in soliciting and awarding energy savings performance contracts (ESPCs), • appointed contracting officer’s representatives (CORs) and conducted base-level oversight of ESPC maintenance and repair, and • validated contractor-claimed energy savings on elect ESPCs.

July 5, 2018

Report of Investigation: Rick A. Uribe Brigadier General U.S. Marine Corps DODIG-2018-131

We investigated allegations that Brigadier General Uribe, while serving as the Deputy Commanding General for Operations-Baghdad, and Director, Combined Joint Operations Center, Baghdad, Combined Joint Forces Land Component Command, Iraq, between May 2016 and June 2017, permitted his officer aide-de-camp to perform activities other than those required in the performance of official duties.

July 3, 2018

Project Announcement: Audit of DoD Management of Medical Claims Through the Third Party Collection Program (Project No. D2018-D000AX-0174.000)

We plan to begin the subject audit in July 2018. Our objective is to determine whether DoD is maximizing collections of medical claims within the Third Party Collection Program. We will consider suggestions from management on additional or revised objectives.

June 29, 2018

Management of Army Equipment in Kuwait and Qatar DODIG-2018-132

We determined whether the Army maintained and accounted for Army Prepositioned Stock-5 (APS-5) equipment in Kuwait and Qatar.

June 28, 2018

Project Announcement: Audit of the B61-12 Tail Kit Assembly Program (Project No. D2018-D000AU-0176.000)

We plan to begin the subject audit in June 2018. Our objective is to determine whether the Air Force is developing the B61-12 Tail Kit Assembly within cost, schedule, and performance requirements.

June 25, 2018

Project Announcement: Audit of the Security Controls Over the Air Force Satellite Control Network (Project No. D2018-D000CT-0159.000)

We plan to begin the subject audit in June 2018. Our objective is to determine whether the Air Force Space Command implemented security controls to protect the Air Force Satellite Control Network against potential cyber attacks.

June 25, 2018

Procurement Quantities of the AH-64E Apache New Build and Remanufacture Helicopter Programs DODIG-2018-130

We determined whether the Army justified procurement quantities for the AH-64E Apache new build and remanufacture helicopter programs.

June 25, 2018

Project Announcement: Summary Audit of Systemic Weaknesses in the Cost of War Reports (Project No. D2018-D000RM-0164.000)

We plan to begin the subject audit in June 2018. Our objective is to summarize systemic weaknesses in DoD's accounting for costs associated with ongoing contingencies identified in Cost of War audit reports issued between 2016 and 2018.

June 25, 2018

Project Announcement: Audit of the National Maintenance Strategy Contract in Afghanistan (Project No. D2018-D000RG-0170.000)

We plan to begin the subject audit in June 2018. Our objective is to determine whether the Army developed the National Maintenance Strategy-Ground Vehicle Systems contract requirements to meet user needs to maintain and sustain the Afghan National Defense and Security Forces' vehicles.

June 22, 2018

Project Announcement: Audit of the Protection of DoD Information Maintained on Contractor Systems and Networks (Project No. D2018-D000CR-0171.000)

We plan to begin the audit in June 2018. We are announcing this audit in response to a request from the Secretary of Defense. Our objective is to determine whether DoD contractors have security controls in place to protect the DoD controlled unclassified information maintained on their systems and networks from internal and external cyber threats.